Brookside Golf Community – Asphalt Roadway Rehabilitation Project

Project: Brookside Golf Community – Asphalt Roadway Rehabilitation Project
Start Date: Phase 1 (Green) will begin on Monday November 4th and is scheduled to be completed on Tuesday November 12th (end of day)

Construction Hours: 7:00am – 6:00pm each day. 

Senior Project Manager: Chris Soria – (510) 366-4204

Project Status: Project is scheduled to begin on Monday November 4th.
Project Update (if applicable): No new updated at this time.

Black Diamond Paving will be conducting a major asphalt rehabilitation project on a section of roadway between 5606 Saint Andrews Drive and 4996 Saint Andrews Drive on the dates listed above. During these times, vehicles will not be allowed to enter or leave the closed section of Saint Andrews Drive according to the construction work hours listed above.  Work will only take place in one phase at a time.

IMPORTANT NOTES:
Residents will be able to re-enter the closed section of work after 6:00pm each day. Please use extra caution when driving through the work zone after 6:00pm as there will be barricades over sewer lids that will require drivers to navigate around.

For residents that live inside the planned construction zone, please note that Monday through Thursday, road will be approx. 5.5 inches lower than your driveway. Vehicles low to the ground may want to park on the road in front of the driveway rather than trying to drive in or out over this “dip”. From Friday through the follow Tuesday, the roads will be approx. 3 inches lower than your driveway. Resident choosing to drive in and out of driveways where the roads will be lower will do so at their own risk.

Trash Pickup: Trash service will take place on normal trash days, however trucks will be onsite at or before 6:00am to begin their route. Please have cans out before that time frame to ensure your cans are emptied. Crews will move cans to the bottom of your driveway after service is completed to ensure the construction work is not delayed.

Mail Service: Postal works will attempt to deliver mail as normal, however if the carrier is unable to reach the mailbox kiosk within the work area, residents will have to pickup their mail at the Calaveras Post Office location located at 1048 West Robinhood Drive, Stockton, CA 95207 (contact number: 209-477-0924). 

Project notices have been posted on all homes inside the work area (and a couple homes near the start and stop points of the project). You may download a copy of the project notice and sitemap by clicking on the link below. If you have any questions or concerns please contact the project manager directly and he will do the best to answer your questions and address your concerns. 

Saint Andrews Drive – Paving Notice – 10-19

Thank you for your patience and cooperation during this project.